The north-east bay
Zurich office · Glare at the window desks
From the modelRevit → glare screening, quick look
In fast glare screenings of four bays on Level 3 of the Zurich office, one on each facade, with assumed bare glazing, every bay is at the indicative EN 17037 level "below minimum" for desks 1 m from the glass. South-east and south-west are worst: the daylight glare probability is above 0.40 in 51 % and 52 % of the 2,600 working hours, and an assumed roller blind kept closed still leaves 31 % and 28 %. On the north-west a blind that closes above 200 W/m² barely changes it (46 % to 45 %); kept closed, 6 %. The north-east is the mildest, at 18 %.
Good as a facade-by-facade brief for the shading and fit-out designer: real glare protection or external shading on the south-east and south-west, a glare-based blind control on the north-west, and care with desks facing the glass in the first metre on every side. A screening, not an EN 17037 compliance report.
Ask your AI assistant
Analyse glare at the office window desks over a working year, one bay per facade, from Revit.
Show the full prompt
Using the Archi Automate MCP, take the Revit scene of [the office] and the facade-bay analysis of [Level 3], with the glass as modelled with [g 0.50, light transmission 0.70] and [internal roller blinds that close above 200 W/m²], and run sim_facade in fast mode for annual glare in [one bay on each facade], with the daylight and the solar gain, the [Zurich typical-year weather file] and true north [62.8°]. Estimate the run time first. Give me the indicative EN 17037 glare level of each bay for desks 1 m from the glass and further in, with and without the blind, and show the result on the Level 3 plan in the Archi Automate viewer.
- Engine
- Claude (assistant). No image or video model; the colours are computed glare levels.
- Input
- Revit
- Time
- sim_facade in fast mode, two runs, about 18 and 17 min; the second reused the passes of an earlier attempt stopped after 41 min; about 57 min of glare computing in all for the three bays of the second run, on one core, with another simulation running on the same PC
- Date
- 2026-11-15
- Tools
- Revit → sim_facade → viewer_capture
- MCP calls
- revit_export_scene → sim_facade → ifc_job_status → viewer_show → viewer_set → viewer_capture
Method
Archi Automate output, unretouched. The image at the top is the Level 3 plan from the second run, captured from the Archi Automate viewer, project north up, with the viewer’s own fast-mode tag, legend, labels, method notes and credits: the three dark bays are the north-west (left), south-west (bottom) and south-east (right) bays. The still below is the first run, with the north-east bay at the top. Each bay’s colour is its indicative EN 17037 glare level for bare glazing, from its worst view 1 m from the glass.
How it was made: the Revit scene of the office was split into glass, spandrel panels, structure and context in an analysis file, and Level 3 into catchment zones behind the facade. The glass is assumed: g 0.50 and light transmission 0.70, with an internal roller blind that closes when more than 200 W/m² reaches the glass; the blind is a generic screen (assumed), not a glare-protection device. sim_facade ran in its fast mode (Quick preset) with Radiance and a typical weather year for Zurich, over the 2,600 working hours from Monday to Friday, 08:00 to 18:00. The view points sit 1.2 m above the floor, 1 m from the glass and halfway into the bay, looking parallel to the glass, at 45° and straight at it.
Two runs, both fast, on the same scene and rules. The first asked for one bay on each facade; only the north-east bay (19.8 m², two windows, 6.0 m deep) gave values, because the other three were L-shaped end bays where every view point fell too close to a wall or outside the bay. The second ran the north-west, south-west and south-east facades again on rectangular bays in the middle of each facade, six windows and 30 view points, all computed. The annual glare runs on one processor core: the first run took about 18 minutes, the second about 17, reusing the passes of an earlier attempt that was stopped after 41 minutes so that other studies could run, while another simulation shared the PC.
What it gives, 1 m from the glass, as the share of working hours with a daylight glare probability above 0.40 (bare glass, then with the blind closing above 200 W/m², then with the blind always closed):
- South-east: 51 %, 39 %, 31 %. Above 0.45: 45 %. Facing the glass: 60 %.
- South-west: 52 %, 41 %, 28 %. Above 0.45: 44 %. Facing the glass: 62 %.
- North-west: 46 %, 45 %, 6 %. Above 0.45: 29 %. Facing the glass: 57 %.
- North-east: 18 %, 17 %, 12 %. Above 0.45: 14 %. Facing the glass: 38 %. (Its worst view is the one at 45° to the right.)
Every bay is at the indicative level “below minimum”. Glare falls off quickly with distance: halfway into the bays, about 3 m in, the views facing the glass are above 0.40 in 15 to 35 % of hours and the views parallel to the glass in 0.2 to 11 %.
Two readings of the result, which the tool does not state itself: on the south-east and south-west the blind does not solve the glare even when always closed, most likely because the generic screen lets direct sun through to the eye, so those sides need a real glare-control product or external shading. On the north-west and north-east the blind rule changes little, most likely because the glare there comes from bright sky and low morning or evening sun that stays under 200 W/m² on the glass, so a control driven by glare rather than by heat would address it; that was not run.
Daylight glare probability: below 0.35 imperceptible, 0.35 to 0.40 perceptible, 0.40 to 0.45 disturbing, above 0.45 intolerable (bands after Wienold, 2009).
Limits
- Early-stage glare screening. Indicative only; not an EN 17037 compliance report. Not for the EN 17037 Annex C glare-protection levels, in any mode.
- Fast mode, as the tool labels it: “Fast glare: no point-in-time check image; sun-free hours read low deep in the room (up to about 15 % in eye illuminance); hours with the sun visible are computed exactly; the annual glare result is an imageless screening. The change in the DGP class shares from normal is not yet measured.” Both runs are fast; they are not compared with any normal run.
- The method, as the viewer states it: “Screening: sun as the only glare source; sky contrast approximated (DGPs). Full DGP when any of the 0.533 degree sun disc is visible; DGPs otherwise. No low-light correction.” The tool’s check against evalglare was made on an earlier build; this build is not yet checked.
- One bay per facade. The north-east bay comes from the first run; the other three are bays in the middle of their facades from the second.
- The glass and the blind are assumed. Specular reflections, light-redirecting systems, slat geometry, contrast glare in dim rooms and reflections on computer screens are not modelled.
- This run used a build of Archi Automate that is not released yet, so the page is marked “In development”.
- Three bays rerun after invalid viewpoints: the L-shaped end bays were replaced with rectangular middle bays; the north-east result is from the first run.
- A previous attempt was stopped after 41 minutes; the second run reused its passes.







