Zurich office · From model to IFC checks
From the modelIFC → quantities, clashes, IDS, carbon
Read straight from the IFC model, the Zurich office comes to about 2,610 t CO2e for modules A1-A3, 288 kg CO2e/m², with the curtain wall's aluminium and glass as the hotspot. Glulam beams cross walls in 109 hard clashes, 89 of them through office partitions, and fire ratings are missing on 277 walls and 16 slabs.
Good for an early carbon hotspot check, coordination, a cost start from quantities whose wall and roof volumes match Revit, and a list of what to fix before handover: the model is not ready for a fire check or FM handover yet, and giving the 143 beams their glulam material alone lowers the estimate by 54.5 t. An early-stage screening, not a certified LCA.
Ask your AI assistant
Open the Zurich office IFC: quantities net of openings, clash checks, IDS samples and a carbon estimate.
Show the full prompt
Using the Archi Automate MCP, open [the office IFC] and give me the quantities by type, with openings subtracted, and compare the wall and roof volumes with [Revit's own figures]. Run clash checks with ifc_clash: [columns against doors with 5 cm clearance], [beams against walls] and [mullions and curtain panels against slabs]. Validate the model against the bundled IDS samples and tell me which fail and why. Write a handover IDS from [one sentence of requirements], check the model against it, classify [the glulam beams] through bSDD and check again. Estimate the embodied carbon with EPDs from [ÖKOBAUDAT] for a gross floor area of [9,062 m²], A1-A3 and whole life over [50 years], and tell me which materials matched an EPD. Then draw the model and its structure with ifc_snapshot.
- Engine
- Claude (assistant). No image or video model; the pictures are ifc_snapshot output.
- Input
- IFC
- Time
- quantities 92.5 s; beams against walls 29.2 s; mullions and panels against slabs 744 s; ifc_validate 105 s; carbon 21 s (A1-A3) and 24.6 s (whole life)
- Date
- 2026-11-15
- Tools
- IFC → quantities → ifc_clash → ifc_validate_ids → carbon_estimate → ifc_snapshot
- MCP calls
- ifc_open → ifc_quantities → ifc_clash → ifc_job_submit → ifc_validate_ids → ids_generate → ifc_classify → ifc_validate → ifc_snapshot
Method
Archi Automate output, unretouched. The pictures are ifc_snapshot output: Archi Automate draws the open IFC model itself, without a design program or the viewer. The main picture is the default isometric view; the snapshot leaves out the terrain, rooms and openings. Its framing cuts off the near bottom corner; the pictures were taken on 14 November 2026, before a later build fixed that framing.
Quantities: 9,899 elements, 5,924.03 m³ of geometry volume, with 153 openings subtracted and the terrain left out. The wall volume, 843.55 m³, and the roof, 827.90 m³, match Revit’s own figures.
Clashes with ifc_clash, with the columns and doors now included: columns against doors with 5 cm clearance gave 28 pairs. Glulam beams against walls gave 109 hard clashes at 0 m clearance, found again on a later development build in 29.2 s: 10 where an edge beam runs inside a 300 mm concrete core wall, 89 where a beam passes through the head of a 125 mm office partition, and 10 where a beam end bears 30 mm into a 200 mm core wall, which is probably intended. Mullions and curtain panels against slabs gave 1,144 hard clashes in 744 seconds, each at most 0.025 m³: the curtain wall is embedded in the slab edges.
IDS, two of the samples that come with Archi Automate: the identity check passes on all 9,899 elements; the classification check fails on all 9,899, as it should on this model, because it carries no classification. A handover IDS written from one sentence, with 7 rules, gave 4 pass and 3 fail on the model as exported, and 5 pass and 2 fail once the 143 glulam beams carried a Uniclass 2015 code from bSDD; the two that remain are real, no fire rating on the 277 walls and the 16 slabs.
Embodied carbon, from the model’s volumes with EPDs from ÖKOBAUDAT: about 2,610 t CO2e for modules A1-A3, 288 kg CO2e/m² over a gross floor area of 9,062 m². Over a 50-year life, about 3,336 t CO2e, 368 kg CO2e/m² (A1-A3 2,609.9 t, A4 14.5 t, A5 3.2 t, B4 763.3 t, C1-C4 112.3 t, and module D −167.0 t counted in that total). EPDs matched three of the six materials, aluminium, concrete and screed: 4,676.8 m³ of the 5,924.0 m³, 79 % of the volume. Early-stage EN 15978 screening estimate from IFC geometry; EPDs where matched, generic factors elsewhere; not a certified LCA; mullions are modelled as solid bars, so aluminium is overstated; the glulam beams carry no material in the IFC and use a generic factor.
Limits
- The carbon figure is an early-stage screening estimate, not a certified LCA. Glass, the partitions and the glulam beams use generic factors; the glulam columns count fossil carbon only, and biogenic timber carbon is left out.
- The IFC schema check reports Revit’s 188 virtual space boundaries, which have no building element.
- Clash counts list every touching pair; the 10 beam-end bearings in the core walls are probably intended, not errors.
- These checks used a build of Archi Automate that is not released yet, so the page is marked “In development”.
- The bundled classification IDS failed on every element before beam classification; the identity check passed. The generated handover IDS still has two failures after classification.
- Fire ratings missing on 277 walls and 16 slabs mean the model is not ready for a fire check or FM handover.