Workflow · Quantities and carbon
Option carbon delta
Estimate two versions of an IFC model with the same EPDs and factors, and trace the difference to the elements that changed. On the Zurich office, an Archi sample model, the pair is a data correction, not a design option: beams given their glulam material, −54.5 t CO2e A1-A3.
−54.5 t CO2e A1-A3 (−2.1 %) once the 143 floor beams carry their glulam material; a data correction, not a design option · Zurich office
288 → 282 kg/m² A1-A3 per m² of gross floor area
2,609.9 → 2,555.3 t A1-A3 total
268.6 m³ moved off the generic default
What was checked
Two runs of the same estimate: ÖKOBAUDAT EPDs, A1-A3 and whole life over 50 years, 9,061.6 m² gross floor area. A, as exported: the 143 beams have no material, so their 268.6 m³ use the generic 400 kg CO2e/m³ default. B: the same file with one change, the beams linked to the model's own glulam material (CH_Glulam_Spruce, which the 66 glulam columns already use), on the ICE v2 glulam factor, 197 kg CO2e/m³, fossil carbon only. Every other material, element type and module is identical in A and B, so the whole difference is the beams.
−54.5 t CO2e, A1-A3 · a data correction (the 143 floor beams given their real glulam material), not a design option; 2,609.9 → 2,555.3 t with the same EPDs and factors
Steps, as the assistant ran them
- ifc_job_submit
Ran carbon_estimate on the IFC as exported (A): 2,609.9 t CO2e for A1-A3, 288.0 kg/m², in 20.7 s.
- ifc_run_write_task
Linked all 143 beams to the model's existing glulam material with one new material association. Geometry and every other element unchanged.
- ifc_save
Saved B as a new file; the input was not overwritten.
- ifc_job_submit
Ran the same estimate on B: 2,555.3 t CO2e for A1-A3, 282.0 kg/m², in 26.0 s.
Tool chain
ifc_job_submit → ifc_run_write_task → ifc_save → ifc_job_submit
Programs in this workflow
- IFC · The open IFC model the tools read, check and write
- Quantities and carbon · Computes quantities and embodied carbon from the IFC
Method
This pair is a data correction, not a design option. The Zurich office’s floor beams came out of Revit without a material, so the estimate put them on a generic default. The assistant gave them the glulam material named in the beams’ own type names, saved that as a second file, and ran the same estimate on both.
A1-A3: 2,609.9 t CO2e as exported, 2,555.3 t with glulam beams, a difference of −54.5 t (−2.1 %), 288 → 282 kg CO2e/m². Whole life over 50 years: 3,336.1 → 3,281.6 t, the same −54.5 t, because neither the generic default nor the glulam factor carries the other modules. The beams themselves: 107.5 t → 52.9 t.
Limits
- A correction of missing model data shown as an A/B pair, not a design alternative.
- Glulam counts fossil carbon only; biogenic carbon stored in the timber is left out. With it, the beams would be net negative in A1-A3; that is not shown.
- Early-stage EN 15978 screening estimate, not a certified LCA. The same aluminium caveats as Carbon per m² apply: solid mullions, and an aluminium EPD a person should review.
- The recorded run used an Archi Automate development build; the tools it calls are in the released version.
- The Zurich office is an Archi sample model, not a built project.