Workflow · Quantities and carbon

COBie handover

Export a COBie 2.4 spreadsheet straight from an IFC model, for the facility manager to complete. From the Zurich office, an Archi sample model: 233 rooms with areas, 164 types and 770 components; there are no COBie categories, real contacts, zones or systems, as the IFC has none.

233 rooms with areas, 8,360 m², in 101 s · Zurich office

7 floors

164 types

770 components

29,282 attributes

What was checked

The IFC as exported from Revit, nothing added. COBie 2.4 (UK 2012) workbook, sheets and rows: Facility 1, Floor 7, Space 233 (every one with a floor and with gross and net area), Type 164, Component 770, Attribute 29,282, Contact 3 (placeholders from the converter). Zone, System, Assembly, Connection, Spare, Resource, Job, Impact, Document, Coordinate and Issue are empty, because the IFC carries none of that.

233 rooms · with areas (8,360 m²) on 7 floors, 164 types and 770 components in a COBie 2.4 workbook

A COBie skeleton for the FM team to complete, written in 101 s. 2026-11-15 · Archi Automate development build · Claude · Archi sample model, a Zurich office. Not a built project. · Archi Automate output, unretouched.

Steps, as the assistant ran them

  1. ifc_job_submit

    Ran export_cobie on the Zurich office IFC in 101 s: a 1.34 MB workbook with 1 facility, 7 floors, 233 rooms and 770 components. Room areas were filled from Revit's room areas, because the IFC has no base quantities for rooms.

Tool chain

ifc_job_submit

Programs in this workflow

  • IFC · The open IFC model the tools read, check and write
  • COBie handover · Writes the COBie workbook

Method

Archi Automate converted the Zurich office IFC to a COBie 2.4 workbook in 101 seconds. The rooms carry Revit’s room areas, 8,360.2 m² in total, because the IFC has no base quantities for rooms; the converter marks each such room with the source of its area. The seven storeys appear once, on the Floor sheet.

The sheets and their rows were read back from the saved workbook. The most common components are 249 office partitions, 87 atrium curtain walls and 66 glulam columns.

Limits

  • The workbook is only as complete as the IFC: no COBie categories (rooms and types are “unknown”), no real contacts, zones, systems or spares. It is a COBie skeleton to fill, not a finished handover.
  • Components are placed by storey only, so their Space column is empty. Floor heights are empty too.
  • Room areas are Revit’s room areas, not IFC base quantities.
  • The recorded run used an Archi Automate development build; the tools it calls are in the released version.
  • The Zurich office is an Archi sample model, not a built project.