Workflow · Model checking
Clash register
Check two sets of elements in an IFC model for hard clashes and write them to a BCF register, one topic per condition, each with a snapshot. On the Zurich office, an Archi sample model, 143 glulam beams against 277 walls gave 109 clashes in five topics; a person decides which are real.
109 hard clashes glulam beams against walls, clearance 0 m, in 29.2 s · Zurich office
63 of 143 glulam beams involved
93 walls involved
5 BCF topics with snapshots
22.98 m³ total overlap
What was checked
All 143 glulam beams against all 277 walls: 420 elements loaded, 594 pairs tested, none skipped. Hard clashes only, clearance 0 m (true interpenetration, with the overlap volume in m³), found by a bounding-box broad phase and OCCT solid intersection. The beams came out of Revit as IfcBuildingElementProxy, so the clash set is named by that IFC class. Columns, doors, mullions and curtain panels were not part of this register.
Issues
| Snapshot | BCF topic | Element | Rule or clash pair |
|---|---|---|---|
![]() | Glulam edge beam runs inside the 300 mm concrete core wall (0.99 m3) | Glulam edge beam 360 × 900 and a 300 mm concrete core wall | Hard clash, 0.99 m³ each, 5 beam lines along each of the 2 core walls; priority High |
![]() | Same edge-beam condition at the second core wall (0.99 m3) | Glulam edge beam 360 × 900 and the second 300 mm core wall | Hard clash, 0.99 m³; priority High |
![]() | Glulam beam through office partition head (0.40 m3) | Glulam beam 240 × 600 and a 125 mm office partition | Hard clash, 0.40 m³, the largest partition overlap; priority Normal |
![]() | Recurring: beam crosses a 125 mm partition head (0.21 m3 each, 41 clashes) | Glulam beam 240 × 600 and a 125 mm office partition | Hard clash, 0.21 m³ each; partitions built up to the slab through the beams; priority Normal |
![]() | Beam end bears 30 mm into the 200 mm core wall (0.0084 m3, 10 clashes) | Glulam beam end and a 200 mm concrete core wall | Hard clash, 0.0084 m³ each, a 30 mm bearing, probably intended; priority Low |
All 5 BCF topics in the file.
Steps, as the assistant ran them
- ifc_open
Opened the Zurich office IFC, the Revit 2027 export as it came out, 163,315 instances in 3.7 s.
- ifc_clash
Tested the 143 glulam beams against the 277 walls with clearance 0 m and found 109 hard clashes between 63 beams and 93 walls in 29.2 s.
- bcf_create
Started a BCF register for the clash results.
- bcf_add_topic
Added five topics, one per condition, each with the beam and the wall as components, a priority, a description and a snapshot.
- bcf_save
Saved the register as a .bcfzip with the five topics, viewpoints and snapshots.
Tool chain
ifc_open → ifc_clash → bcf_create → bcf_add_topic → bcf_save
Programs in this workflow
- IFC · The open IFC model the tools read, check and write
- Clash check · Finds hard clashes between two sets of elements
- BCF issues · Writes the issues as a BCF file with snapshots
Method
The clash run tested the 143 glulam beams of the Zurich office against its 277 walls and found 109 hard clashes, 22.98 m³ of overlap in total. They fall into three conditions: 10 clashes where an edge beam runs inside a 300 mm concrete core wall (0.99 m³ each); 89 where a beam passes through the head of a 125 mm office partition, on every floor from L00 to L05 (0.009 to 0.40 m³); and 10 where a beam end bears 30 mm into a 200 mm core wall (0.0084 m³ each), which is probably intended. The assistant grouped them into five BCF topics, each with its snapshot, so the structural engineer can open them in their own BCF tool.
The snapshots are the tool’s own BCF pictures, 800 × 600 pixels: the clashing pair in orange, the rest of the building in grey. Nothing was retouched.
Limits
- Only beams against walls was asked for here. The same build also clashes columns, doors, mullions and curtain panels; those runs are not part of this register.
- A clash count lists every pair that touches. The 30 mm beam-end bearings are probably intended; a person decides which clashes are real problems.
- The three core-wall snapshots show scattered dark shards beside the building: that is the site terrain as the BCF snapshot draws it.
- The recorded run used an Archi Automate development build; the tools it calls are in the released version.
- The Zurich office is an Archi sample model, not a built project.